Saturday, November 14, 2009
Updates as Promised
That being said, I have added some new posts to my quilting blog. You should go check out the cute quilts people have been making! And see the cute Cars quilt that I FINALLY finished for Marshy.
Okay, so it's not completely done, yet, but it will be. It's about 7/8 of the way bound. :)
ALSO! There are less than 2 weeks until the NEW MOON PARTY. I am so excited! It's going to be awesome. It's funny, but we've sold a whole bunch of tickets these last few days. It's starting to look like we might sell all of our tickets :) YAY! BUT! Tickets are still available, so if you are interested PLEASE give us a call 801-423-1876 or email me at coltonsangels@gmail.com.
More updates coming, I promise! :)
Friday, October 16, 2009
Late Nights
I get a lot done, surprisingly.
Tonight I finished a hard quilt, and started to load another one on. It was at that point that I realized I didn't have the right color of purple thread! UGH!
I seriously thought I was going to be able to finish the whole quilt tonight. Instead, I have to haul my butt up to the SLC tomorrow morning to buy thread. AND I have to take the top with me because it is a weird color of purple and I don't want to buy 5 cones to have none of them work out. That would suck.
So, here's to another late night with not very much accomplished. Wish me luck for tomorrow!
Monday, October 5, 2009
It feels like FOREVER!
I finally updated my quilting blog. YAY! GO check out some of the really cute quilts people have brought me!
This is my sweet little cheeser, standing in front of Cameron and Lauren's quilt. He is so funny. He loves to have his picture taken. Every time I get the camera out he says: "Momma, Marshall?" he wants his picture taken all the time. I'll have to take him to get his picture taken in his Halloween costume....if I ever get it done.
Sunday, August 9, 2009
Quilting updates
Anyway, please go check it out. There are some really cute quilts on there. Some of them you can get patterns, fabric, notions, whatever for at Gracie Lou's. They have the cutest things! I swear, if I had unlimited resources, didn't have to sleep, and had all my time to myself, I would totally quilt all day!!
Also, I know that school is just starting (next week), but it's never too early to start thinking about custom made Christmas presents. T-shirt quilts make great Christmas presents, and you don't even have to do anything to get them! I will do all the work, you just provide the t-shirts. The quilts start at $14.00 per block. That includes everything needed to make the quilt: materials, labor, quilting, binding, batting.....EVERYTHING. Including FABRIC.
Thursday, August 6, 2009
Referral Program
Saturday, August 1, 2009
One of those days....
The kind of days when things don't get done.
Why? Because I'm currently re-reading the Twilight Saga. It is way better than I remembered it.
Anyway, I have managed to get a few things done. Several quilts, in particular. This one was my favorite. It took me a week, but it turned out so good!
Also, I've started working out again. UGH! It is so hard. Last night was the worst, because we had a bbq right before. I would've put it off, but I know that I have to be good. Besides, I have a work out buddy and she was already at my house! haha
I'm also working on a few other things, so we'll see how they all go. Does anyone else ever feel like they are stretched too thin in a million directions? It's not just me, right?
Also, preparing for court at the end of August. I'm nervous, but excited. Again, I'll let ya'all know how that one turns out.
Next week I hope to be done reading the Twilight books, so then I'll have more time to actually post things here on my blog. :D
Monday, March 16, 2009
Productive
Since I couldn't quilt, I decided to get to work on the commissioned quilts I am doing for a family friend out in NY. I got all the pieces cut out for both quilts. Then I cut and attached the binding for Marshy's "Froggin' Saur Bankdie" so I can finally finish it for him! He's been using it without the binding on it, so it will be nice to be able to have it finished.
I stayed a little later today, and got most of 1 of the commissioned quilts sewn together, and pieces of the 2nd one sewn together. Tomorrow is Colton's Angels at 6, so I will stay at work, instead of going home, and hopefully finish piecing at least the first top together. I am hoping to have them quilted by the weekend so that I can have them bound by Monday! Yes, just a little ambitious. haha
Tuesday, March 3, 2009
Quilt Posts and Pricing
Also, there's a new pricing list here.
Friday, January 23, 2009
Fun New Game
If you look closely in the picture above, you can see his toes peeking out through the handle hole.
You can easily see his little fingers in this one, but his head is a little harder to see. It's right there above the fingers a few inches, though. He was practically bent in half! Oh to be that flexible again!Which reminds me.... how is it possible that I can work out for 5 straight days, but the routines are getting harder instead of easier? Shouldn't they get easier the more you do them?? Seriously! Major pain tonight was what I experienced. OUCH!
Also, looked at an apartment in SF, and LOVED IT! Turned in an application. Hope we get it. The scary part is that they ask you how much debt you owe and what your monthly payment is. When you lump it all together like that it looks really bad. Good news, though, with Mike's nice paycheck, and my added income from quilting (and soon to be added medical transcriptionist income as soon as I finish the class in June), we have been able to make more than the minimum monthly payments (and we've been paying a lot in rent for where live). So, hopefully we'll get this place, and since the rent is a lot lower, we'll be able to pay off even more! Oh that would be so nice!! :) Fingers Crossed!!
Saturday, January 17, 2009
Catching up
While I waited for Mike to tell me which flight he'd be on, I ran up to the SLC to purchase some needed supplies for my business. I knew I had a couple of quilts that needed kind of a teal/turquoise color, but I couldn't remember how dark the fabrics were. I took a wild guess and bought a medium tone. Turns out it was the PERFECT color for a set of bumper pads and baby quilt I am doing for a client. LUCKY!
After the trip to the supplier, I stopped by my parents' house to wait for Mike's call (I was late picking him up, because his plane landed 30 minutes early! STUPID!). They have been converting their home from regular power to solar power. It has been quite the ordeal. They had to have several trees removed from their front yard (1 because it was rotting inside out and was splitting in 2 and would have fallen on the house. YIKES!). They had a new roof put in, and were without any heat for about a week while they installed a new solar-friendly, energy effecient heating system. They replaced 32 of the 34 windows, upgraded the wiring system, and installed a whole bunch of mini skylights. When I went over they already had the water heater solar panels up, but the regular panels (the other 50 or something crazy like that) hadn't arrived yet. CRAZY! Fortunately for my mom, things are getting a little less hectic now that the workers are done ripping out windows and molding, and reroofing, etc.
These next few pictures I took the other day at work. Marsh was so tired.
Tuesday, January 13, 2009
Business Trip
Tuesday, December 23, 2008
FINISHED!!
Pictures coming soon!
And now I'm going to go down some children's tylenol multi-symptom cold medicine for my cough so that I can get some sleep. Aaah. Sleep.
P.S. - Can you believe there are only 2 days until CHRISTMAS?! I can't!!! In fact, I'm kinda freaking out over here!!
Tuesday, December 16, 2008
More Quilt Pics
Adventures in a T-Shirt Quilt: Day 6
Monday, December 15, 2008
Adventures in a T-Shirt Quilt: Day 5
Last night I unpicked rows 3, 4, and 5. Tonight I sewed row 3 back together. Then I had to unpick the first block again, and re-sew it. I finally gave up, and sewed it on to the row 1/2 unit. It is still off by a little, but what can you do? Once something has stretched out, you can't unstretch it.
I have decided that even though it is 10:45 PM, I am going to sew as late as I possible can. I also have to cut and seam a back for a different client's quilt. I will probably be up quite late, but it's okay, because I really need to get this all done, and my family understands.
My goal for tonight: Re-sew and attach row 4 to the row 1/2/3/ unit, and re-sew row 5. Hopefully attach row 5 to the rest of the rows. That would be so great to finish the quilt top tonight. We'll see.
My goal for tomorrow: Find the backing fabric so I can get this quilt ready for quilting!
Sunday, December 14, 2008
Adventures in a T-Shirt Quilt: Day 4
Hopefully I can get it finished tomorrow during the commercials for Chuck and Heroes! :)
Two more projects finished
I have 2 cousins getting married this month. They are sisters, and one is on the 26th and one is on the 27th. Not having time to shop for anything, and wanting to do something a little more personal, I decided to throw together these two table runners. I haven't decided who gets which, though.
Adventures in a T-Shirt Quilt: Day 3
I am hoping to spend tomorrow afternoon finishing this quilt top. Then all I need to do is buy the backing fabric on Monday, and put this baby in line at the shop for quilting.
This has been surprisingly easier than I expected. The piecing has gone by fairly fast, and I'm sure if I didn't have to keep changing diapers every 30 minutes that I would definitely have gotten more done. I pieced for 3 hours tonight, and I feel like I've accomplished quite a lot.
I am definitely starting to think that this is something I would enjoy doing again and again, for both myself and for clients. In fact, I am hoping to make one for my brother for Christmas (I KNOW! I am nuts! I know it won't get finished in time, so it will be more of a Happy New Years present, probably).
Friday, December 12, 2008
Adventures in a T-Shirt Quilt: Day 2
I finished fusing the interfacing to the t-shirts, and cut the remaining shirts out. Then I cut out all of my vertical sashing strips....all 30 of them....at 2 1/2 inches wide. I still need to cut out the horizontal strips. There will only be 12 of those, thank goodness!
I also laid out all the blocks and arranged them in a pleasing manner. I even started to sew the sashing on, but then I ran out of bobbin thread, and I didn't have a pre-wound one ready, so I am done for the evening.
I would have gotten a lot more done, except that Marsh had to be taken on another car ride to get him to go to sleep. He was snoring when we got home...so cute...and then he said "OFF!" when I laid him in bed, but he didn't wake up. He must have been dreaming.
Tomorrow, Day 3, I am hoping to get the sashing all sewn onto the blocks, and the quilt top assembled. I still need to buy the backing fabric. I haven't found anything that really jumps out at me and says "This is exactly what Nate wanted! BUY ME BUY ME!" I have a couple of options, but I still need to check a few stores. Hopefully I can get this sucker quilted by next Friday. That would just be awesome!
Thursday, December 11, 2008
Adventures in a T-Shirt Quilt: Day 1
I went to Joann's Fabrics after work today, and bought 9 yards of lightweight Pellon fusible interfacing, 3 yards of a solid navy blue "Quilter's Solids" fabric, and a Full size (because that's all they had) polyfill batting about 1/4 inch loft. It was only $34. Not too shabby. This took about 1 hour, because the Orem Joann's is always busy and you always have to wait for at least 20 minutes to get your stuff cut.
I got home, ate dinner, and proceeded to cut apart the t-shirts. Up one side, across the sleeve, through the neck, across the other sleeve, and down the other side. It took about an hour. Since I am only using 25 blocks, I had to pick which shirts to use. The polos were a little thick, so they were immediately disqualified. Fortunately, one of the t-shirts had enough of a pattern on the back that I could use it as well as the front. I ended up using 22 t-shirts (with 1 back) and the 2 button ups.
After the shirts were cut apart, I proceeded to cut out large sized pieces of the interfacing, place them on the t-shirts, with the stretch going opposite the stretch of the tees, and iron them on securely. I didn't buy enough interfacing! The 9 yards only lasted for 16 of the shirts! I have 8 shirts left. Fortunately, it is only $0.99 per yard, so I figure another 5 or 6 yards should do the trick, and not be too pricey. Ironing on to the 16 shirts took about 2 hours.
Then I centered and cut out the 12 1/2 inch squares from each of the 16 shirts with interfacing, which only took about 30 minutes. This is what I have to show for my work on this project:
Sorry the picture is a little dark and blurry. I left my good camera at work by accident, so I had to use my phone.
I feel pretty good about todays progress. He doesn't need it until the 27th, but because we are closed the 25-28 I have to have it done before Christmas. No big deal, right? Throw it on the stack of 50 bazillion other things I'm working on! :)
Stay tuned for more Adventures in a T-Shirt Quilt! I will be working on it every night, hopefully, so I'll definitely keep ya'all posted on my progress. This is so fun, because I have always wanted to do one, but not had the time, and now I have to do one for a client, so it works out! :)


